CC20151 with CC20152 leads 12 loaded-tanker wagons from Maos to Tegal, passing in the Karangsari Bridge, where the double track project (Purwokerto-Patuguran) is working. This trainset must be dra... (more)
CC20151 with CC20152 leads 12 Loaded-Tanker Wagons from Maos to Tegal, passing in the Karangsari Curve, where the double track project (between Purwokerto-Patuguran) is working. This Tanker Train... (more)